The listed walls were to be partially demolished and rebuilt for a “cut and cover” carriageway tunnel to pass across the site. We prepared a Conservation Plan and a methodology to minimise the damage to the historic structures. Linda Sampson made this computer drawing of the complete length of the flint and stone elements showing their dimensions and condition. Further detailed photographs recorded the appearance for the contractor to rebuild after the tunnel was made.